Tiny Home. Big Move.

Yippee! I’ve been waiting to say this for the longest time now: the tiny house is finished and was moved on Tuesday. After an extra few days on trim work, we finally wrapped things up and got that sucker hooked to my truck. After only 6 miles down the road my truck overheated and I had to call my Dad to finish the pulling. I guess Fords do suck and Chevys are much better at handling such tasks. There I said it. Hopefully this doesn’t start a war! LOL. To my trucks credit it pulled my boat with the 4-wheeler in the bed just fine. Thank God for awesome and understanding Fathers who are willing to lend a hand (or truck).

I still have to finish the countertop in the kitchen and tile under and around the fire place and hook up the water and propane. Doug is finishing the bump-out that will hold the propane tanks and water heater… hopefully it’s done soon because I’m getting tired of driving back-n-forth from the old cabin to my new location. I’m going to poly the interior this weekend. I should be spending my first night in my new home sometime early this week.

Moving has been hell to say the least. I didn’t have any help and it took me 6 hours to take down the tipi. I may have downsized from my earlier move, but it’s clear that there is still to much “stuff” to fit into my tiny home and another downsizing is in order. That’s okay though, I like garage sales! I have one more trip to the cabin to get the last of my belongings: my plants and my food. Then I’m DONE! What a relief… I can finally settle down and do some fishing.

DSC_1278

Trimming the windows

DSC_1280

Wood floor installed

DSC_1282

Building the interior walls (bathroom and closet)

DSC_1288

The “crapper.” Composting toilet by Natures Head- the same one I used in the tipi.

DSC_1307

All settled in at the new location

DSC_1310

The living room

DSC_1312

The loft

DSC_1313

Kitchen. No countertops or shelves yet.

DSC_1314

View from kitchen. Closet is on the right and food pantry is on the left.

DSC_1315

Solar and wind power convertor. I’m building a bench w/table over it. And Myles!!!!

DSC_1316

Living room ceiling. It really adds to the space and makes the room feel so much larger.

Tiny House Update: Nearing Completion!

Things are still going strong on the tiny house build. The roof is on, the loft window is in, some of the cedar shake has been completed on the outside, the door was installed and trimmed out and we’ve started tackling the cedar tongue and groove on the interior walls. We are hoping we can have this puppy on the road this coming Wednesday.

Doug spent today working on some of the interior while I hauled some things to my parents. Today I also installed a break controller in my pickup… I sure hope I’m able to pull this thing! Worse case scenario: call in backup.

Not tiny house related: went to the show with Mom and saw Jurassic World in 3D. I thought it was pretty good, Mom was bored. Figures.

Hopefully by this time next week I will have some “finished” photos for you to see. For now here is the recap of last week!

DSC_1250 DSC_1251 DSC_1252 DSC_1258 DSC_1260 DSC_1261 DSC_1262

Tiny House Construction Update. Days 2-10

It’s been pretty hectic these past few weeks. Things are going amazing and surprisingly very fast. I see no reason that we can’t have this project completed and moved to the property by June 19th.

Here is a recap of the following weeks with some pictures. Pay no mind to the date & time on the photos… I didn’t have it set right LOL.

Day #2 Subfloor insulation and sheeting.

DSC_1133 DSC_1136 DSC_1141

Day #3 Framing the side walls.

DSC_1144 DSC_1148 DSC_1151 DSC_1154 DSC_1155

Day#4 Installing the rafters and framing the end wall (tongue side).

DSC_1157 DSC_1159  DSC_1167

Day#5 Framing end wall (tail end), sheeting and tar papering the roof.

DSC_1161

DSC_1168

DSC_1170DSC_1171

Day#6 Tyvek installation, electrical, roof gables, installing end window.

DSC_1185 DSC_1186 DSC_1187 DSC_1188

Day #7 Installing remaining windows and end wall sheeting (tongue side).

DSC_1189DSC_1190DSC_1194

Day #8 (Rain Day) Staining wall sheeting.

 

Day#9 Sheeting remaining walls.

DSC_1191 DSC_1193  DSC_1195

Day #10 Spraying interior with insulation.

DSC_1197 DSC_1199 DSC_1201 DSC_1203 DSC_1204 DSC_1206 DSC_1207

As you can see… we’ve been busy. I can’t wait to start on the interior.